The power generation of the Upper Marsyangdi A Hydropower Station in 2022 reaches 100 million kWh
Source:
Author:
Time: 2022-05-13
As of May 4, 2022, the power generation of the Upper Marsyangdi A Hydropower Station in Nepal has reached 100 million kWh, completing 28.6% of the annual power generation plan.
Marsyandi A hydropower station has generated 1.77 billion kWh since commercial operation in 2017. The station has been making great contribution to Nepal's social and economic development.
相关新闻:
上一条:
下一条: