The first wind power project invested by POWERCHINA in Europe is connected to the grid
Source:
Author:
Time: 2024-10-08
On October 1,the Ivovik wind farm project in Bosnia and Herzegovina, which is controlled and invested by PowerChina, successfully realized grid-connected power generation. The total installed capacity of the project is 84 MW, with an average designed annual generating capacity of 259 million KWH, which is currently the largest wind farm in Bosnia and Herzegovina. The project has created more than 100 local jobs during the construction period, contributing to local employment and economic development.
相关新闻:
上一条:
下一条: